Habulay Brine Evaporation Test
1.0 litre of Habulay saline water yielded 350 grams of pan-dried crystal salt
To confirm physical salt recovery ahead of lined pilot pond construction, Noolays evaporated a measured 1.0-litre brine sample from the Habulay Saline River Basin (Dihun Woreda, Nogob Zone), recovering 350 grams of crystalline salt weighed after pan-drying.
Pan-Dried Crystal Salt Harvest
Select either photograph to view full resolution, or use the optical magnifier below to inspect crystal structure.
Complete 350 g Harvest
Granular Halite Texture
Drag cursor or finger over crystals to magnify 2.4×
Commercial Crystal Quality
Well-formed cubic halite grains suited to mechanical washing, grading and iodization during pilot and commercial operations.
Record NSP-EVAP-2026-01
| Developer | Noolays Salt Producer Cooperative |
|---|---|
| Resource Location | Habulay Saline River Basin, Dihun Woreda |
| Date Recorded | 21 October 2026 |
| Brine Volume | 1.0 litre (1,000 mL) |
| Pan-Dried Yield | 350 grams crystal salt |
| Dissolved NaCl Basis | ~318 g/L (near-saturated brine) |
Why High-Salinity Feed Matters
Coastal seawater saltworks require ~85–90% of their land area solely to concentrate dilute seawater (~35 g/L) up to saturation. Starting with hypersaline continental brine dramatically reduces primary pond area, accelerates harvest cycles and lowers capital expenditure per tonne.
Pilot & Commercial Pond Yield Estimator
Estimate net washed salt output across pilot and commercial pond batches using controlled crystalliser recovery (70–80% on 318 g/L NaCl).
| Development Scale | Brine Volume | Indicative Washed NaCl (70–80%) | Commercial Objective |
|---|---|---|---|
| Recorded Test | 1 litre | 350 g pan-dried (~220–250 g washed) | Completed initial brine recovery check |
| Unit Cubic Metre | 1 m³ | 220–260 kg | Standard engineering design unit |
| Lined Test Pan | 10 m³ | 2.2–2.6 tonnes | Crust growth & washing optimization |
| Pilot Pond Batch | 100 m³ | 22–26 tonnes | Commercial buyer qualification & unit cost |
| Full Pilot Cycle | 500 m³ | 110–130 tonnes | Pre-commercial off-take delivery & scale-up |