Building a Modern Salt Industry Through Partnership

From Natural Salt Resources to a Modern Industry

Noolays Salt Producer Cooperative is developing a salt production and processing project in Dihun Woreda, Nogob Zone, Somali Regional State of Ethiopia, with the ambition to progress from pilot production to modern processing and full-scale industrial development. We are seeking strategic investors, technology partners, industrial partners, and long-term commercial partners who share our vision of building a sustainable salt industry together.

97.45% & 98.78%Oct 2025 rock-salt NaCl assays (Garbo Arag & Habulay River)
350 g / LitrePreliminary recorded 1.0 L brine test (Oct 2026, unverified)
>250,000 mg/LPreliminary hypersaline brine TDS survey indication
150–200 haMapped solar-evaporation pond corridor
Future LinesPlanned industrial, livestock & future iodized edible salt
Pilot → ScaleMilestone-gated cooperative development model
Why partner with Noolays

A Staged Salt Development Anchored in Dihun Woreda

Established by members of the local community in Dihun Woreda, Nogob Zone, Noolays combines local cooperative resource stewardship with disciplined solar-salt engineering and staged capital deployment.

Ethiopian & Regional Market Potential

Developing the Habulay basin resource in Dihun Woreda (with an executive office in Jigjiga City) toward future supply of industrial processing salt, pastoral livestock salt, and — as a future product line subject to refining, iodization, food-safety testing, and regulatory compliance — refined iodized edible salt.

Separate Survey & Assay Evidence

October 2025 national laboratory assays on two Dihun Woreda rock-salt samples reported 97.45% NaCl (Garbo Arag) and 98.78% NaCl (Habulay River) on a dry basis, alongside preliminary basin survey indications (>250,000 mg/L TDS; 7–9 mm/day solar evaporation).

Disciplined Cooperative Governance

Member-owned cooperative committed to written quotations, independent quality control, monthly financial reporting, and milestone-gated progression from pilot verification to commercial scale.

Preliminary field-test record · 21 October 2026

Recorded Habulay Brine Evaporation Trial

Preliminary Test Record — 350 g/L Result

Preliminary evaporation test: A recorded 1.0-litre Habulay brine sample yielded 350 grams of recovered dry crystalline solids. The result requires repeat testing, moisture verification, and chemical analysis before it can be used as a commercial production assumption.

This October 2026 pre-pilot evaporation trial is a separate Cooperative-recorded observation; the recovered solids have not yet undergone independent laboratory certification and are distinct from the October 2025 rock-salt assays.

1.0 LitreRecorded Habulay brine sample
350 GramsRecovered dry crystalline solids
Pre-PilotRepeat & lab verification required
350 g recovered dry crystalline solids in sample tray from 1.0-litre Habulay brine test
Plate E-01 · 350 g of recovered dry crystalline solids from a recorded 1.0-litre Habulay brine sample (Oct 2026).
Close-up of crystalline solids from the October 2026 evaporation test
Plate E-02 · Close-up of crystalline solids from the preliminary October 2026 test (pending chemical analysis).
Official investor & technical library

Download Project Documents (PDF)

Four concise executive summaries prepared for prospective investors, engineering teams, and commercial partners.

PDF · 4 PAGES

Cooperative Profile

Cooperative governance, core business principles, and the Habulay salt project at a glance.

403 KB · October 2026

Download Cooperative Profile
PDF · 2 PAGES

Investment & Partnerships Summary

The staged development model, milestone-gated capital approach, partnership structures, and next steps.

90 KB · October 2026

Download Investment Summary
PDF · 1 PAGE

Laboratory Summary

October 2025 Ethiopian Mineral Corporation rock-salt assay (97.45% Garbo Arag & 98.78% Habulay River NaCl).

56 KB · October 2026

Download Laboratory Summary
PDF · 2 PAGES

Geological & Brine Survey Summary

Public summary of Habulay basin survey indications, solar evaporation rates, and mapped pond corridors.

390 KB · October 2026

Download Survey Summary

Partner With Noolays on Phase 1 Pilot Development

We welcome investors, solar-pond engineers, equipment suppliers, and future off-take buyers to review our data room or schedule a briefing.

WhatsApp